It was all good just a month ago…
Life has been really weird for the past month. Surreal. Bizarro.
![]() |
See that tiny patch of mold that we were losing our minds over? |
Skipping some of melodrama of the exact issues, at end of the day we needed a new HVAC system installed. I brought the kids home on July 5th to sit still in the stifling heat (there were not enough box fans in the world for those two days, luckily the boys handled the heat better than I did) so the workers could install the new system. And the guys were great. They stayed late 2 days in a row to get that system up and running for us, and our attic was easily well over 100 degrees.
![]() |
‘Your attic is a mess – this is going to take a while’ |
We called our usual interior contractors to come over and cut out the affected sheetrock and assess any other potential damage/treatment needed. As scary as the word ‘mold’ is to a homeowner (or a parent), the truth is that if the source is eliminated (broken, leaking HVAC) and the growth is removed, and everything is cleaned properly (patch of sheet rock, some insulation, lotso bleach), you really have nothing to worry about going forward. We breathed a nice cool sigh of relief. Approximately two+ weeks of hot hell was over. Yipee! Our bad luck streak had officially ended.
In the meantime, we had gotten word that another set of contractors we had hired to basically redo our exterior (roof! siding! deck! fence!) were finally going to to start the work…you guessed it, the last week of my maternity leave. July 18, 2016. See IG picture above if you already forgot what the real story is about.